Sample Projects
   
        • Falcon Hill Phase 1 Construction - Hill Air Force                Base, Utah

        • Two 3 MG and a  7 MG Water Tanks - Water Pro,                 Draper, Utah

         • 5 MG and 8 MG Water Tanks - Magna Water                        Company, Magna Utah
         
         • Lookout Ridge Subdivision - Herriman, Utah
       
         • South Mountain -- Multiple Phases - Draper, Utah

         • Well No. 7 Magna Water Company - Magna, Utah

       • Development Costing Suncrest, Phases 4. 5, 6
 
         • Hurricane Arch Bridge
            - Coordinated steel fabrication within 2mm                            tolerance                
            - Monitored installation of bridge members

         • Little Cottonwood Water Treatment Plant,  Salt                    Lake Metropolitan Improvement District -                           Cottonwood Heights, Utah
             - Filter Backwash Improvements

         • Mike Weir Drive Roadway Construction - Draper,              Utah
             -2 million CY mass excavation
              

       

        



Construction Managementcd

Infinity Consultants Construction Management team has extensive experience managing all aspects of civil and structural construction projects. We employ quality assurance and redundancy techniques for the management, inspection, and contract document adherence of construction projects. Infinity Consultants understands critical aspects of construction which reduce the maintenance of a system, and lengthen its functional lifespan. Through proper construction oversight we assure owners that schedules and budgets are met.



Capabilities

  • Construction Cost Estimating

  • Bidding and Contract Administration

  • Construction Administration

  • Quality Control and Inspection

  • Constructive Records and Documentation

  • Material Testing

  • Construction Scheduling

  • Final Approval and Project Close Out